When the waste stowing technique is used in coal mining,the waste conveyor has some problems which are 1) frequent movement of the conveyor,2) frequent dismounting of its frame,3) continuous shortening of the conveyor belt,and 4) the joint between the discharge end of the conveyor and the position where the wastes fill.
矸石充填采煤对充填巷内矸石运输设备有以下要求:矸石输送机在矸石充填过程中不断外移、机架不断拆除、皮带不断缩短、机尾卸矸点与矸石充填部搭接问题等。
本站部份资料来自网络或由网友提供,如有问题请速与我们联系,我们将立即处理!
Copyright © 2013-2024 杭州优配网络科技有限公司 All Rights Reserved 浙ICP备20019715号
免责声明:本站非营利性站点,以方便网友为主,仅供学习。合作/投诉联系QQ:1553292129