By analyzing the period, discharge, method of river closure for the second stage and hydraulic computation results,end dump closure method with single dike upstream was selected in Guigang shipping hub.
通过对贵港航运枢纽二期截流时段、流量、方式以及水力计算成果的综合分析,确定采用上游单戗堤立堵截流。