Based on the many years measured data of prototype for dam,with the correlation between piezometeric level and the head difference and potential line to study the seepage stability of dam foundation, it indicates that the seepage of Nianyushan reservoir major dam is normal.
根据主坝多年的观测资料,以测压管水头与上下游水位差的相关线以及位势过程线,来评判坝基蓄水期的渗流稳定状态表明,鲇鱼山水库主坝坝基渗流状态基本正常。
本站部份资料来自网络或由网友提供,如有问题请速与我们联系,我们将立即处理!
Copyright © 2013-2024 杭州优配网络科技有限公司 All Rights Reserved 浙ICP备20019715号
免责声明:本站非营利性站点,以方便网友为主,仅供学习。合作/投诉联系QQ:1553292129