Their reversal potentials were -(76.
试验中测得峰电流与平台电流的逆转电位分别为-(76。
The on-site application and verification of technical requirements on 1,000 kV live working,such as minimum safety distance,minimum complex gap,minimum effective insulation length of tools,safety protection,shift of potential and etc,were analyzed in the test.
试验对1000kV带电作业最小安全距离、最小组合间隙、绝缘工具最小有效绝缘长度、安全防护、电位转移等技术要求进行了现场应用试验研究。
本站部份资料来自网络或由网友提供,如有问题请速与我们联系,我们将立即处理!
Copyright © 2013-2024 杭州优配网络科技有限公司 All Rights Reserved 浙ICP备20019715号
免责声明:本站非营利性站点,以方便网友为主,仅供学习。合作/投诉联系QQ:1553292129