This paper focused on the distribution of main anchor rope inside gate pile and sub-major anchor rope inside bearing beam in the gate room with structure of both side gate piles connected with bearing beam.
本文主要研究了小浪底工程排沙洞出口用支承梁连接两侧闸墩的问室结构中,闸墩内主锚索和支承梁内次锚索的布置型式和束数。
本站部份资料来自网络或由网友提供,如有问题请速与我们联系,我们将立即处理!
Copyright © 2013-2024 杭州优配网络科技有限公司 All Rights Reserved 浙ICP备20019715号
免责声明:本站非营利性站点,以方便网友为主,仅供学习。合作/投诉联系QQ:1553292129