board and pillar method

基本解释房柱式开采法

网络释义

1)board and pillar method,房柱式开采法2)board and wall method,房柱式开采法3)bord and pillar method,房柱式开采法4)bord and wall method,房柱式开采法5)heading and stall method,房柱式开采法6)heading and stall system,房柱式开采法7)stall and breast method,房柱式开采法8)stoop and room,房柱式开采法9)stoop and room system,房柱式开采法10)room and pillar,房柱

用法和例句

Because Zhaokou mine of Jinling iron mine of Shandong make use of strata pressure controlling theory to do reasonable dividing for declinate ore body room and pillar,the calculated recovery ratio η is up to 73 6% and maintaining the stability of mining field at the same time.

山东金岭铁矿召口分矿运用地压控制理论,对倾斜矿体房柱进行合理划分,计算回采率η达73。

最新行业英语

本站部份资料来自网络或由网友提供,如有问题请速与我们联系,我们将立即处理!

Copyright © 2013-2024 杭州优配网络科技有限公司 All Rights Reserved 浙ICP备20019715号

免责声明:本站非营利性站点,以方便网友为主,仅供学习。合作/投诉联系QQ:1553292129