Hoisting technique of steel vestibule of super high, super weight and large span;
超高、超重、大跨度钢通廊的吊装技术
In the National Conference Center Project at Beijing Olympic Park(Area B),there were super high and super heavy floor at 13 locations,with storey heights from 7.
北京奥林匹克公园(B区)国家会议中心工程超高、超重顶板共计13个部位,层高为7。
本站部份资料来自网络或由网友提供,如有问题请速与我们联系,我们将立即处理!
Copyright © 2013-2024 杭州优配网络科技有限公司 All Rights Reserved 浙ICP备20019715号
免责声明:本站非营利性站点,以方便网友为主,仅供学习。合作/投诉联系QQ:1553292129