A new type of the fixture for a crane rail can be designed by the following steps: start off with the analysis of various loads of a crane rail, then the horizontal force of the rail top is calculated and a forced diagram of the fixture of the rail is given, by which the horizontal force and the vertical thrusting force of the rail fixture are obtained.
从分析吊车轨道上的各种荷载入手 ,进而计算出轨道顶部的设计水平力 ,给出了轨道固定件的受力简图 ,求出轨道固定件受到的水平力和竖向推力 ,从而设计出新型的轨道固定件。
本站部份资料来自网络或由网友提供,如有问题请速与我们联系,我们将立即处理!
Copyright © 2013-2024 杭州优配网络科技有限公司 All Rights Reserved 浙ICP备20019715号
免责声明:本站非营利性站点,以方便网友为主,仅供学习。合作/投诉联系QQ:1553292129